|

The
side view of Mr. Cleaves three story addition, the walls, floors
and roof were all built with the 3-d panels . All of the work being
preformed by Mr. Cleave.

Shotcrete has
been applied to the 3-d panels at the pool.
|

A view from
the side shows corbels after shotcrete has been applied.

A ground up view of Mr. Cleave residence.
|