"LG's Steakhouse"

Spraying or shotcrete application of first coat of portland cement on interior side, after this coat sets braces will be removed and the wall will hold its true radius.

 

Spraying shotcrete or portland cement on radius wall, Please note the scaffold, it is very important to have the scaffold set to the proper height. We use walk thru frames, the productions is much greater, the scaffold is fastened to the foam panel wall system with wire.

Finished concrete wall structure after the final coat of portland cement mortar was applied. Note: The temporary wood jams installed into window and door openings, these will hold openings true until windows and doors can be set.

Finishing portland cement walls on the backside of LG’S, the Hadrian TriDi System employee is shaving off excess portland cement. Note: The long straight rod being used, they are still spraying on the other side, you can see the two hose pullers feeding hose to the nozzle man.

Plastic pipe, This plastic pipe was used as a screed to achieve the desired radius, the shotcrete or cement mortar mix is brought out to the outside edge of the pipe. The yellow string line is fastened to the top of the foam wall system and set plum. Portland cement or shotcrete mix was finished to the out side edge of the plastic pipe, thus achieving a true radius.

 

 

Telephone (760) 643-2307, Fax (760) 643-2305 or E-Mail us.

 