"LG's Steakhouse"

Photo of Hadrian TriDiPanel employee setting plastic pipe screed.

 

Hadrian TriDiPanel employee setting pump hose in place on scaffolding, the screeds have been set in place. A note here. It is very important to have all trims, screeds, wires, wire mesh set in place perfect and protection of items, you don’t want damaged by shotcrete or portland cement before pumping cement, very critical.

Shotcrete or spraying portland cement.

Portland cement and plastic screed.

Wood 2 x 4's set in place perpendicular to plastic pipe, this will serve as a temporary guide where the inside corner intersects with radius wall, the 2 x 4's will then be removed and a void filled with shotcrete or cement, you can see in photo the nozzle man preparing to fill this area with portland cement shotcrete.

 

 

Telephone (760) 643-2307, Fax (760) 643-2305 or E-Mail us.

 

back to the top