Landscape Walls

Once the walls are set, cement is sprayed onto the surfaces.

Here is the finished wall. Notice the shelf that has been built into the wall.

The five square holes were cut in place and the shelf was installed by one installer in less than an hour.

Finished  wall  at Las Flores, stucco has been applied to 3–d panel wall.

 

 

Telephone (760) 643-2307, Fax (760) 643-2305 or E-Mail us.

back to the top